Sweet Success: Solving Sugar Factory Challenges A leading sugar factory was facing repeated disruptions due to frequent failures of their slurry pump used for the filter press feed. Oct 17, 2024
Refined Recovery: Cutting Heavy Metal Waste with a Hydrocyclone Solution Our client's thickener tank was accumulating valuable heavy metals, which were being lost as waste instead of being reclaimed. Sep 1, 2024
Enhanced Filter Press Feed Pump in Metal Processing A world-class metal processing company was facing operational challenges with their existing Schabavert C200 filter press feed pump. Aug 14, 2024
The Seal of Approval A major metal processing company faced a challenge in its process of neutralizing several acids using a vessel filled with gypsum (H2O + CaSO4). May 1, 2023
Boosting Slurry Pump Performance Our customer, specializing in excavating raw materials such as sand and stone, experienced frustration with their underperforming 8/6 pump. Apr 1, 2023
Exceeding Expectations with Gravel Pump Retrofit A client operating a dredge boat outfitted with an 8x6 gravel pump was grappling with frequent maintenance issues. Mar 1, 2023
Efficient Dredge Pump Maintenance A prominent dredging mill that uses nine Linatex® and two Warman® pumps to wash and separate different kinds of sand faced significant wear on their pumps due to the large amounts of crushed material used. Feb 1, 2023
From clogged to cost saving: Transforming a recycling plant’s installation A prominent plastic recycling company grappled with persistent clogging and inefficiency in their existing plastic deflaker pumps. Jan 1, 2023
Big Pumps, Meticulous Maintenance A dredge boat with two large Warman® 18x16 gravel pumps required yearly inspections and overhauls to maintain optimal performance and longevity. Dec 1, 2022
Complete Changeover for Plastic Recycling Plant Within a demanding application in a plastic recycling plant, KSB’s KWP pumps failed after barely six months of service. Nov 1, 2022
Bypassing Risky Repairs in Sand Quarry Pumps Our customer, who operates a sand quarry, contacted Vaikon for urgent intervention on one of their Linatex® 300x250 IIIr pumps. Oct 1, 2022
Tunneling Pumps: From Worn to Reborn A client approached Vaikon with four Warman® 6x6 EEG pumps requiring complete refurbishment within four weeks. Sep 1, 2022